Mount Saint Mary College – Case Study

Lounge with curved dark seating, a round table, and stained glass panels set into the far wall.

Project

Mount Saint Mary College – Newburgh, NY

Mount Saint Mary College tasked our team with transforming an under-utilized residence halland former chapel into a state-of-the-art wellness center on its Newburgh campus.

The Desmond Center for Community Engagement and Wellness Center was proposed to providemedical and educational services for underserved individuals and families in the localcommunity, including the uninsured.

Blueprints

This project required both the renovation of existing structures and the construction of newstructures. Our team took the lead on converting the existing chapel into a new multi-purposeroom, which included a 200-square-foot addition.

We also constructed an 800-square-foot,two-story lobby, and reception area that included a steel structure, glass curtainwall system,exterior aluminum panel siding, custom steel stair system with glass railing, and a customreception desk.

We renovated 14,000 square feet of the former residence hall’s interior,including window replacements and a complete remodel of the HVAC system, electrical,plumbing, and other finishes, transforming the space into exam rooms for patients and officesfor healthcare staff and students.

Nuts & Bolts

Our team specializes in preserving the special details that make every project unique, especiallywhen it comes to renovations.

While renovating the chapel into a multi-purpose room, ourteam was able to salvage and incorporate all of the existing stained glass from the chapel intothe designs of the new addition, preserving the character of the former structure.

Over 2,000existing bricks were salvaged, cleaned, and reused in the final design, lending to a moreauthentic final design.

Completion

MHCM has a vast history of seeing projects through from conception to completion, allowingthe team to successfully lead a project like the Desmond Center to its current completed state.

The Desmond Center for Community and Engagement was completed in April 2023, just 14months after breaking ground.

In addition to providing opportunities for area educators andprofessionals to volunteer their services, the Center will also house the college’s Desmondprogram for adult enrichment. It will hold educational workshops, family counseling services,fitness checks, immunizations, and professional development events, among other services.

The Desmond Center expects to serve more than 4,000 residents per year and be instrumentalin supporting the long-term health and wellness of the community.

Date

April 19, 2023

Category

Case Study

Author

Brian Powers

Category

https://mhcm-dev.webflow.io/insights/mount-saint-mary-college-case-study

Insights

Recent articles and resources

Practical guidance for successful project delivery

Officials and project team members standing in front of Beacon fire and rescue apparatus.

The News

January 29, 2025

City of Beacon Fire Station – Case Study

Brian Powers

https://mhcm-dev.webflow.io/insights/city-of-beacon-fire-station-case-study

Building Knowledge podcast graphic for episode 49 featuring James Madison, chief estimator.

The News

January 8, 2025

Chief Estimator James Madison featured on Building Knowledge with The Building and Realty Institute on WVOX

Brian Powers

https://mhcm-dev.webflow.io/insights/chief-estimator-james-madison-featured-on-building-knowledge-with-the-building-and-realty-institute-on-wvox

Mid Hudson Construction Management logo

Press Release

January 7, 2025

New Year, New Structure At Mid Hudson Construction Management

Brian Powers

https://mhcm-dev.webflow.io/insights/new-year-new-structure-at-mid-hudson-construction-management

Let's Move Your Project Forward.

Whether your project is still in the planning stages or ready to move into construction, MHCM brings the insight, coordination, and experience needed to help guide it forward.

Pre-engineered metal building with multiple overhead doors and a newly paved apron.